As a precautionary response to COVID-19, Ohio EPA is currently operating with most staff working remotely. If you are working with our staff on a current project and you know the name of the employee you are working with, email them at firstname.lastname@epa.ohio.gov or call them directly. The Agency website has contact information for every district, division, and office. To report a spill or environmental emergency, contact the spill hotline (800) 282-9378 or (614) 224-0946. This number should only be used for emergencies. For all other calls, please contact Ohio EPA’s main phone line at (614) 644-3020 or the main line for the division or office you are trying to reach.

After March 23, our district offices and Central Office will be temporarily closed and will have increasingly limited ability to receive deliveries, plans, etc. All entities are encouraged to submit plans, permit applications, etc., electronically where there are existing avenues to do so, such as the eBusiness Center (eBiz). Please refer to the list of available services on the main eBiz webpage. We encourage you to make use of all that apply, even if you have not used eBiz in the past. Plans under 25 MB can be emailed. For large plans over 25 MB, entities should work with the reviewer/division to upload via LiquidFiles. Directions for submitting docs via LiquidFiles is available on YouTube. We apologize for the inconvenience and thank you in advance for your understanding. If you wish to send hard copies of documents to any of Ohio EPA’s district offices, the best method to ensure we receive these documents is to send them via U.S. Mail. Since all offices are closed, deliveries outside of U.S. Mail (FedEx, UPS) will likely be returned because the offices are closed and deliveries cannot be made.



1/13/14
PUBLIC INTEREST CENTER: (614) 644-2160
MEDIA CONTACT: Erin Strouse
CITIZEN CONTACT: Amber Finkelstein


Mingo Junction Project Receives $2.4 Million Low-Interest Ohio EPA Loan for Sewers

Ohio EPA has issued a $2.4 million low-interest loan to Mingo Junction to help separate the village’s sanitary and storm sewers. Preventing infiltration from storm water sewers will reduce sewer overflows and excess flow to the wastewater treatment plant, which will decrease treatment costs and help improve water quality.

Construction began in November and should be completed within six months. Approximately 3,115 feet of sanitary sewer and 2,940 feet of storm sewer will be replaced.

The village qualified for a 1 percent interest loan, which is expected to save an estimated $1.3 million over the 20-year life of the loan when compared to the market rate. The remaining funding sources include a loan and grant from the Ohio Public Works Commission for approximately $339,376.

Since 1989, Ohio’s Water Pollution Control Loan Fund (WPCLF) has awarded more than $6 billion in below-market financing for sewage treatment plant upgrades and other water quality improvement projects. The program has saved borrowers more than $1.1 billion in interest. Low-interest loans also have been provided to municipalities and individuals for agricultural best management practices; home sewage system improvements; contaminated site cleanup; and landfill closures. Additionally, the WPCLF can provide technical assistance to public wastewater systems in a variety of areas from the planning, design and construction of improvements to enhancing the technical, managerial and financial capacity of these systems.

The loan program is managed by Ohio EPA’s Division of Environmental and Financial Assistance, with assistance from the Ohio Water Development Authority. Ohio EPA is responsible for program development and implementation, individual project coordination, and environmental reviews of projects seeking funds. The Ohio Water Development Authority provides financial management of the fund.

-30-

The Ohio Environmental Protection Agency was created in 1972 to consolidate efforts to protect and improve air quality, water quality and waste management in Ohio. Since then, air pollutants dropped by as much as 90 percent; large rivers meeting standards improved from 21 percent to 89 percent; and hundreds of polluting, open dumps were replaced with engineered landfills and an increased emphasis on waste reduction and recycling.

 
 800-282-9378