|
Municipal Storm Water Are You Ready for May 2008?
Series of six workshops coordinated by OCAPP
 Workshop #5
Post-Construction Best Management Practice Case Studies: Making It Work in Northeast Ohio
February 13, 2008
Ohio EPA Northeast District Office, 2110 East Aurora Road, Twinsburg, Ohio
OCAPP will apply for RS and Certified Waste Water Operator continuing education credits to be available for attendees. (Coffee and ice water will be served. Please bring your water bottle and/or cup.)
Hosted by Office of Compliance Assistance and Pollution Prevention (OCAPP), Ohio EPA Presented by Chagrin River Watershed Partners (CRWP); Geauga County Engineer; GPD Group; LDC, Inc.; Ohio Dept. of Natural Resources (ODNR); Ohio EPA; City of Westlake; and Zwick & Associates
AGENDA for WORKSHOP #5
Caution: The presentations with audio are in FLASH format and require a minimum Internet connection speed of 100 kbps (cable modem, DSL, etc.).
Click on a title for presentations and the handouts for the workshop. For the presentation with audio recording, click on the FLASH version.
|
Post-Construction BMPs in Ohio: Requirements, Alternatives and the Next 5 Years
|
Dan Bogoevski, Ohio EPA
|
|
Establishing a Long-Term Maintenance Program for Post-Construction BMPs: Geauga County Model
|
Robert L Phillips, Geauga Cty Engineer
|
|
Designing Stormwater Management Ponds for Water Quality: Tips for Plan Reviewers
|
Jay Dorsey, ODNR
|
|
Case Studies – New Development
|
|
|
Cascade Creek Subdivision: Successful Incorporation of Structural and Non-Structural BMPs in Site Design
|
Peter Zwick, Zwick & Assoc.
|
|
Sheetz Gas Station: Bioretention Cells on Small Commercial Developments
|
Leonardo Sferra, GPD Group
|
|
Dealing with Unusual Site Conditions: Sand Filters and Alternative BMPs on a Condominium Project
|
Thomas E. Beutler, P.E., LDC, Inc.
|
|
Case Studies – Retrofit Projects
|
|
|
Streetscapes in Orange Village and Pepper Pike: Locating Bioretention Cells and Enhanced Swales within Existing Infrastructure
|
Rachel Webb, CRWP
|
|
Crocker Road Detention Basin: Retrofitting Existing Ponds To Serve New and Existing Development
|
Jeff Sinnema, Engineering Dept. City of Westlake
|
Ohio Environmental Protection Agency Northeast District Office - Twinsburg Telephone 330-963-1200 Fax 330-487-0769
|