Ohio EPA, Division of Surface Water
122 South Front Street
Columbus, OH 43215
614-644-2001


OEPA Home | DSW Home | Director
Air | Land | Water | Pollution Prevention | Public Information

Agency Links: Public Participation | Offices and Programs | Small Business Assistance

Division Links: Forms and Publications | Rules and Laws | Policies and Guidance
Surface Water Programs | Related Sites | About Us | What's New


Last Updated: Thursday, 04-Sep-2008 15:31:28 EDT

Construction Storm Water Program

On this page:
Note: some of the documents on this page are in PDF format which requires the Adobe Acrobat™ reader. The reader can be downloaded at no cost from Adobe.


Background

Construction sites impact Ohio's waters by:
  • adding pollutants, especially sediment, to rainwater running off of construction sites during construction; and
  • making long-term land use changes that alter the hydrology and pollutant loading of local streams.
To limit the negative impacts of construction projects on Ohio's waters, Ohio EPA administers a permitting program designed to document construction activity in the state and require practices that keep pollutants out of the streams. The permitting program is mandated in the Clean Water Act and is part of the NPDES (National Pollutant Discharge Elimination System) program.
Who needs a permit?

As of March 10, 2003, if your project disturbs 1 or more acres of ground, you must get a permit to discharge storm water from your site. If your project disturbs less than 1 acre but is part of a larger plan of development or sale, you also need a permit to discharge storm water from the site.

How do I get a permit?

Most sites may get permit coverage under the general permit for discharge of storm water associated with construction activity. To get permit coverage, follow these steps, in order:

  • Develop a Storm Water Pollution Prevention Plan (SWP3) for the construction site;
  • Submit a Notice of Intent (NOI) requesting coverage for your discharges under the general permit;
  • Wait until you receive the Ohio EPA approval letter stating that you are covered under the general permit;
  • Ensure that contractors, subcontractors and staff understand their roles in carrying out the SWP3;
  • Implement the SWP3;
  • Proceed with construction, including regular maintenance and inspection (PDF 32K) of sediment and erosion controls and storm water management facilities.

Potential Waivers for 1 to 5 Acre Site Disturbances


Information and Permit Compliance Materials


Construction General Permits


For Additional Information:

see the Storm Water Program Contacts page.


Back to Storm Water Program page.