Ohio EPA, Division of Surface Water
122 South Front Street
Columbus, OH 43215
614-644-2001


OEPA Home | DSW Home | Director
Air | Land | Water | Pollution Prevention | Public Information

Agency Links: Public Participation | Offices and Programs | Small Business Assistance

Division Links: Forms and Publications | Rules and Laws | Policies and Guidance
Surface Water Programs | Related Sites | About Us | What's New


Last Updated: Friday, 07-Mar-2008 10:26:16 EST

Draft NPDES General Permit for Storm Water Associated with Construction Activity Located Within Portions of the Olentangy River Watershed

Note: the documents on this page are in PDF format which requires the Adobe Acrobat™ reader. The reader can be downloaded at no cost from Adobe. If you have problems downloading large PDF files click here.


March 7, 2008

On March 14, 2008, Ohio EPA is public noticing a public hearing on a draft National Pollutant Discharge Elimination System (NPDES) general permit that would authorize storm water discharges from construction activities disturbing one or more acres of land that are located within specific portions of the Olentangy River watershed. This is the second draft of this general permit to be public noticed for comment. This draft permit contains significant changes to the original draft permit that was public noticed on March 12, 2007. The Draft General Permit for Storm Water Associated with Construction Activity Located within Portions of the Olentangy River Watershed includes additional requirements, beyond current statewide construction storm water general permit requirements, to address recommendations of the Total Maximum Daily Load (TMDL) for the Olentangy River watershed.
 
An Ohio EPA information session and public hearing to accept comments on the draft general permit has been scheduled at 6:00 P.M. on April 30, 2008, at Dempsey Middle School, 599 Pennsylvania Avenue, Delaware, Ohio 43015. The public hearing will end when everyone in attendance has had an opportunity to provide comments related to the draft general permit. In lieu of attending the public hearing, written comments may be submitted in person or by mail no later than May 7, 2008. Deliver or mail all comments to:

  Ohio Environmental Protection Agency
  Division of Surface Water – Permits Processing Unit
  50 West Town Street, Suite 700
  P.O. Box 1049
  Columbus, Ohio 43216-1049

 
Olentangy River, just downstream of the City of Delaware

The Ohio EPA permit number should appear next to the above address on the envelope and on each page of any submitted comments.

See the documents below for more information.

For background on this draft permit, go to the Draft General Permit that was public noticed on March 12, 2007.


For additional information contact:

Jason Fyffe
DSW Storm Water & Enforcement Section
(614) 728-1793
e-mail: jason.fyffe@epa.state.oh.us

Back to General Permits page.
Back to Storm Water Program page.